Two blocks are only operating at half capacity in Paks

The first block of the Paks Nuclear Power Plant is operating at 50% capacity due to a generator protection incident. This follows the second block's reduced capacity maintenance since October 16. Currently, only the third block operates at full capacity, resulting in a total output of just over 1000 MW, half of its nominal capacity of 2000 MW.