Tunnel under the Oder and metro in Wrocław? Authorities take the first step
Geological studies in Wrocław will assess the feasibility of building an underground railway, including soil load capacity and groundwater levels. Local authorities emphasize the need for this project due to the saturation of surface infrastructure. The goal is to reactivate the Świebodzki Station by 2030, with plans for a subterranean station linked to a metro system. Despite skepticism regarding hydrological conditions, officials believe modern technology can overcome these challenges, suggesting that if tunnels can be built under oceans, similar projects in Wrocław are feasible.