Tunnels on the Krakow bypass closed. Detours have been prepared for drivers.
The tunnels in Zielonki and Dziekanowice will be closed for maintenance work on ventilation, control, and safety systems. The Zielonki tunnel will be closed overnight from Wednesday to Thursday, while the Dziekanowice tunnel will close the following night. Drivers will be redirected to alternative routes during these closures. The S52 expressway, which opened in December 2024, features two tunnels and connects various roads through three interchanges. The project cost approximately 1.4 billion PLN, with significant EU funding.
Fact-check this story: paste the text or link into Justifact and get a verdict with the sources consulted.